Greenworks were engaged by the City of Greater Bendigo to reconstruct the Wilson Road Bridge in Leichhardt.

Greenworks were awarded the contract to construct the Lollypop Creek wetland by the Baulderstone Leighton Joint venture as a part of the regional rail project in Wyndham Vale.

Greenworks were engaged by the John Holland Group  to construct VicRoads Type 2 rock beaching at the Mitcham and Rooks Road Alliance site.  

The historic site at Point Nepean National Park required remediation works to deal with contaminated material on site.

Greenworks was engaged by Winslow to undertake rock beaching works for an energy dissipation and sediment pond on an outlet drain at Sneydes Road, Point Cook.

Greenworks conducted perimeter access track resurfacing works for Melbourne Water at the Silvan Reservoir including supply, spreading, grading and compaction of crushed rock.

Greenworks were engaged to supply and place graded rock beaching along a 3km section of the Maribyrnong River in Footscray.

Greenworks were engaged to construct Type 1 and Type 2 beaching at various sites along the recent M80 widening.

Greenworks were engaged by Melbourne Water to reinstate large woody debris to the Little Yarra River at Wesburn.

Greenworks was engaged to remove existing debris and to re-encase a water main crossing Mile Creek in Dandenong prior to its exposure to impending rain events.

Abigroup engaged Greenworks to repair and reinstate rock beaching to Melbourne Water standards as part of the M1 freeway upgrade in Kooyong.

Greenworks were engaged to construct grouted rock outlets to reinstate the structural integrity of a walking track.