Greenworks is a CCF Systems Certified Contractor x

Greenworks were engaged by Melbourne Water in March 2016 to remove a large amount of asbestos contaminated silt in the Merri Creek in Coburg. A Greenworks excavator removed the accumulated soil, which was then loaded into bins, wrapped and then covered in plastic for safe disposal to an EPA approved site. The job was completed with no adverse impact […]

Greenworks were contacted to desilt a culvert underneath the Monash Freeway on Gardiners Creek. The large quad-culvert bridge was not functioning at full capacity due to a large build up of asbestos contaminated silt in one of the culverts. Greenworks loaded the silt onto pre-plastic wrapped trucks, ready for removal to an approved EPA disposal […]

Greenworks were engaged by Melbourne Water in May 2016 to remove asbestos contaminated silt on the Koonung Creek Trail. The 4 culverts running underneath a public path connecting Bushy Creek to Koonung Creek, were failing to work to full capacity due to large amounts of silt being built up on either side. With the use of our […]

Greenworks are currently undertaking works to rehabilitate the fishway downstream of Garden Avenue within Brimbank Park, Keilor, restoring fish passage in the lower reaches of Maribyrnong River.

Greenworks were engaged by Melbourne Water in March 16 to conduct waterway improvement works on the Darebin Creek in Ivanhoe.

Greenworks were engaged by Melbourne Water to conduct a structural report and reconstruct the footbridge at Mt Waverley Retarding Basin.

Greenworks were engaged by the City of Greater Bendigo to reconstruct the Wilson Road Bridge in Leichhardt.

Greenworks were awarded the contract to construct the Lollypop Creek wetland by the Baulderstone Leighton Joint venture as a part of the regional rail project in Wyndham Vale.

Greenworks were engaged by the John Holland Group  to construct VicRoads Type 2 rock beaching at the Mitcham and Rooks Road Alliance site.  

The historic site at Point Nepean National Park required remediation works to deal with contaminated material on site.

Greenworks was engaged by Winslow to undertake rock beaching works for an energy dissipation and sediment pond on an outlet drain at Sneydes Road, Point Cook.

Greenworks conducted perimeter access track resurfacing works for Melbourne Water at the Silvan Reservoir including supply, spreading, grading and compaction of crushed rock.