Greenworks were engaged by Melbourne Water  in March 2017 to stabilize Yarra River bank at Thomas Ave Warburton as part of Amenity & Storm water improvement project. The project originally came about in response to community concerns about erosion of the Yarra river bank at a popular tourist spot. Scope of works included bank stabilisation, […]

Greenworks were engaged by Melbourne Water in January 2017 to conduct concrete works at Greenslopes Retarding Basin. Scope of works included concrete works around the surcharge pit and pump down the wetland pondage to locate the syphon outlet.

Greenworks were contacted to desilt a culvert underneath the Monash Freeway on Scotchmans Creek. The quad-culvert bridge was not functioning at full capacity due to large amounts of silt being built up in one of the culverts. With the use of our machines, Greenworks moved the silt into plastic wrapped bins and disposed the spoil […]

In 2016, Greenworks conducted vegetation and debris removal works from laneway for City of Darebin at Allenby Avenue Reservoir.  

Greenworks were engaged by Melbourne Water in November 2016 to rehabilitate a section of the Dyer Creek and Nash Creek in Bunyip State Park. The tasks included bollard installation and revegetation besides Bunyip River as well as coir log installation in Dyer Creek and Nash Creek.    

Greenworks were engaged by Melbourne Water in November 2016 to rehabilitate Wannarkladdin Wetland. The existing track was failing to function due to the large amount of stormwater resulting in a smelly pond. Scope of works was to supply and place 100mm granitic gravel to the existing 900-metre-long track as well as to remove vegetation and compact […]

Greenworks were engaged by Melbourne Water in March 2016 to remove a large amount of asbestos contaminated silt in the Merri Creek in Coburg. A Greenworks excavator removed the accumulated soil, which was then loaded into bins, wrapped and then covered in plastic for safe disposal to an EPA approved site. The job was completed with no adverse impact […]

Greenworks were contacted to desilt a culvert underneath the Monash Freeway on Gardiners Creek. The large quad-culvert bridge was not functioning at full capacity due to a large build up of asbestos contaminated silt in one of the culverts. Greenworks loaded the silt onto pre-plastic wrapped trucks, ready for removal to an approved EPA disposal […]

Greenworks were engaged by Melbourne Water in May 2016 to remove asbestos contaminated silt on the Koonung Creek Trail. The 4 culverts running underneath a public path connecting Bushy Creek to Koonung Creek, were failing to work to full capacity due to large amounts of silt being built up on either side. With the use of our […]

Greenworks are currently undertaking works to rehabilitate the fishway downstream of Garden Avenue within Brimbank Park, Keilor, restoring fish passage in the lower reaches of Maribyrnong River.

Greenworks were engaged by Melbourne Water in March 16 to conduct waterway improvement works on the Darebin Creek in Ivanhoe.

Greenworks were engaged by Melbourne Water to conduct a structural report and reconstruct the footbridge at Mt Waverley Retarding Basin.