Greenworks is a CCF Systems Certified Contractor x

Sneydes Road Point Cook, Sediment Pond

  • Skills Needed:
    Outlet Structure, Rock Beaching, Wetland Construction
  • Client:
    Winslow Constructors

Greenworks was engaged by Winslow to undertake rock beaching works for an energy dissipation and sediment pond on an outlet drain at Sneydes Road, Point Cook.

Works involved excavation of approximately 600 cubic metres of material followed by placement of landscape rock beaching and construction of a spillway entrance.

The works included matching existing outlet pipes into the new sediment pond.